You must log in or # to comment.
36 Finch was the worst during the construction. It was so bumpy and slow.
The LRT will be more reliable and sustainable especially during rush hour, when it’s needed most. If only we could have gotten it to jump that gap between Finch (or Sheppard) and Finch West it would have been so good.